What to confirm with the testing laboratory before a concrete pour

NYC Department of Buildings · 2026-09-15

A practical starting point for contractors: identify the responsible laboratory, confirm the testing scope, and settle specimen handling and reporting before concrete arrives.

A concrete-testing request needs more than a delivery time. Before the pour, the contractor and project team should agree who is doing the testing, what the project requires and how results will reach the people who need them.

Start with the responsible laboratory

For New York City building work, the Department of Buildings states that concrete testing, including field testing and sampling, must be performed by a DOB-licensed concrete testing laboratory. Verify the laboratory's current status rather than treating an appointment confirmation as proof of qualification. Requirements outside NYC should be checked for the project's jurisdiction.

Put the project requirements in front of the laboratory

The NRMCA/ASCC pre-construction checklist treats testing as part of a wider discussion among the owner, design team, contractor, concrete producer and testing agency. Use that discussion to establish responsibilities before work starts.

As a practical request format, supply the job address, site contact, proposed placement date, expected start time and relevant project documents. Ask the laboratory to confirm the scope it has accepted and any information still outstanding. A request sent is not yet confirmed attendance.

Separate specimen handling from the test result

NRMCA's strength-testing guidance distinguishes standard-cured specimens used for acceptance from field-cured specimens used to help assess in-place strength. The project team should establish which specimens and test ages are required. Avoid assuming one testing schedule applies to every project.

The same guidance explains that specimen fabrication, handling, curing and testing can affect measured strength. Ask who will provide the initial storage arrangements, identify specimens and arrange transfer to the laboratory. Those responsibilities should be explicit rather than left for the end of the pour.

Decide how results will be used

Agree who receives reports and who handles questions about results. NRMCA notes that a low individual result does not automatically mean concrete fails the applicable acceptance requirements. Interpretation belongs with the responsible project professionals and the governing specifications; a dispatch or pickup service does not make that engineering determination.

A practical final check

Before confirming the appointment, resolve three questions: has the responsible laboratory accepted the scope, does the site team know the handling arrangements, and do the reporting contacts match the project requirements? Keep the written confirmation with the job records and communicate changes promptly.

This guide provides a planning starting point. The project's specifications and responsible professionals determine the actual testing program.